ŞIRNAK DAM AND HES PROJECT
ŞIRNAK DAM AND HES PROJECT
Hydro Electric Power Plant
| Employer | SMS Investment |
|---|---|
| Installed Power | 5MW |
| Turbine Type: | Froncis |
| Turbine Brand: | HPP |
| Number of Turbines | 2 |
| Annual Production: | 24000MWh |
Related projects
Hydro Electric Power Plant
| Employer | SMS Investment |
|---|---|
| Installed Power | 5MW |
| Turbine Type: | Froncis |
| Turbine Brand: | HPP |
| Number of Turbines | 2 |
| Annual Production: | 24000MWh |